“Two others quoted a rate per load and couldn't tell me how many loads. Brad measured it, gave me one number in writing, and that's exactly what I paid.”
Soil Removal · Excavation · SE MelbourneSoil Removal & Excavation · SE Melb
Site cuts and soil removal, quoted to the metre.
Most quotes are a rate per load from someone who never counted the loads. I measure the volume, price the tipping, and hand you one fixed number in writing, before a truck moves.
- Volume measured off your plans, never estimated
- Tip fees and spoil classification priced in up front
- Fixed price in writing the same day you enquire
Get your fixed price quote
Brad calls to confirm the job, then your written quote lands the same day.
No crews. No subcontractors. Just Brad, on your site.

Why builders keep calling
Most excavation quotes go wrong before the machine even arrives.
I'm Brad Cain. I've watched too many people get handed a rate per load by someone who never counted the loads, then get an invoice with tip fees bolted on the end.
So I do it the other way round. I measure the volume off your plans or on site, classify the spoil before I price it, and give you one number that covers the machine, the trucks and the tipping. That number is what you pay.
If the ground throws up something genuinely unforeseeable, you hear about it from me before it costs you a cent. Never after, and never on the invoice.Brad Cain, Owner & OperatorGet My Fixed Price Quote
What we do
Four jobs. Measured properly, priced up front.
What clients say
Don't take our word for it.
“Side access was barely a metre and everyone else wanted a crane. Brad got the mini through, protected the paving, left it spotless.”
“Fixed price, no surprises, finished on time. Our concreters walked onto a site that was actually ready.”
“Spoil came back classified and I braced for a bill. Brad had already allowed for it in the original quote.”
“We'd been let down by two others before Brad. Quoted fast, started when he said, no dramas at all.”
“Hit rock on a tight deadline. He sorted it same day and told me the cost before he did it. Absolute legend.”
“Two others quoted a rate per load and couldn't tell me how many loads. Brad measured it, gave me one number in writing, and that's exactly what I paid.”
“Side access was barely a metre and everyone else wanted a crane. Brad got the mini through, protected the paving, left it spotless.”
“Fixed price, no surprises, finished on time. Our concreters walked onto a site that was actually ready.”
“Spoil came back classified and I braced for a bill. Brad had already allowed for it in the original quote.”
“We'd been let down by two others before Brad. Quoted fast, started when he said, no dramas at all.”
“Hit rock on a tight deadline. He sorted it same day and told me the cost before he did it. Absolute legend.”
“Two others quoted a rate per load and couldn't tell me how many loads. Brad measured it, gave me one number in writing, and that's exactly what I paid.”
“Side access was barely a metre and everyone else wanted a crane. Brad got the mini through, protected the paving, left it spotless.”
“Fixed price, no surprises, finished on time. Our concreters walked onto a site that was actually ready.”
“Spoil came back classified and I braced for a bill. Brad had already allowed for it in the original quote.”
“We'd been let down by two others before Brad. Quoted fast, started when he said, no dramas at all.”
“Hit rock on a tight deadline. He sorted it same day and told me the cost before he did it. Absolute legend.”
The Cain guarantee
Measured right. Priced right. Quoted the same day.
Enquire before 3pm and your fixed price lands before knock-off. No ballpark, no rate you have to multiply out yourself, no surprises once the trucks turn up.
- 01Same-day written quote
Before 3pm and it's with you before knock-off. After 3pm, first thing next morning.
- 02The quote is the invoice
Volume measured, tipping and classification included. Any genuine ground surprise is raised with you before it costs a cent.
- 03Your site handed back clean
Access protected before the first load, driveways and verges left as we found them, site swept on exit.
- 04Brad on every job
No subcontractors, no crews you've never met. Fully insured, certificate supplied with the quote.
No obligation. No pressure. A measured quote and a fixed price in writing.

Get your quote
One number, in writing, before the day's out.
Four details and Brad will call to confirm the job. No obligation, no lead-selling, no rate you have to work out yourself.
- Brad calls you the same day
- Volume measured before anything is priced
- Tipping and classification inside the quote
- Zero obligation to go ahead
Get your fixed price quote
Same-day callback, written quote before knock-off.
I handle every job from first call to finished site. Brad






